Leave a Message

Thank you for your message. We will be in touch with you shortly.

Glendale Solar NEM Homeowner Operations Checklist

November 6, 2025

Buying or moving into a Glendale home with rooftop solar should feel like an upgrade, not a mystery. You want lower bills, clear paperwork, and a smooth transfer of ownership. This guide gives you a step-by-step checklist for meters, billing, documentation, monitoring apps, and warranty tracking tailored to Glendale, so you know what to collect, who to call, and what to expect. Let’s dive in.

Glendale basics: utility and permits

Glendale Water & Power (GWP) is your primary authority for solar interconnection, meter questions, and billing. Always confirm current GWP requirements for interconnection, meter upgrades, and export compensation before you make changes or transfer ownership.

Solar installations in Glendale follow the California Electrical Code and local permitting. The City of Glendale Building & Safety issues permits and requires inspections. Your permit final and Permission to Operate (PTO) from the utility are key documents during a sale.

California’s net energy policies have changed in recent years. State rules for investor-owned utilities evolved from NEM 1.0 to NEM 2.0 to NEM 3.0. Municipal utilities like GWP may have different programs, so you should verify which tariff applies to your specific Glendale account.

Meters and billing 101 in Glendale

Understanding your meter and billing plan helps you verify savings and spot issues.

Meter types you may see

  • Bi-directional meter: Measures energy you use from the grid and energy you export back. Often paired with netting of imports and exports.
  • Interval or smart meter: Records energy in timed intervals and enables time-of-use (TOU) billing and more detailed export credits.
  • Meter upgrade: A swap may be required for interconnection or TOU. The utility typically performs it; timing and any fees vary.

How billing usually works

  • Net metering vs net billing: Older programs often net kWh at or near retail. Newer programs may credit exports at a set value that can vary by time and conditions.
  • TOU rates matter: Your solar exports can be worth more or less depending on the time period. Know your account’s TOU schedule.
  • Confirm with GWP: Ask if your account is on a legacy net-metering plan, a different export program, and whether any meter work is required.

Interconnection and PTO: what to expect

The interconnection and approval process follows a common arc. Timelines vary by workload and documentation.

  1. Pre-install planning: Installer confirms utility requirements for meters and any export limits.

  2. Permits and inspection: City of Glendale issues permits; installer schedules inspections.

  3. Interconnection application: Utility reviews technical details like system size and single-line diagram.

  4. Meter work and inspections: GWP may upgrade or replace the meter; final safety checks occur.

  5. PTO issued: You receive written authorization to operate and export power.

  6. Ongoing billing: Your bills reflect the applicable tariff and time periods.

Build your solar document binder

Collect these items in one place. This binder protects your rights, speeds up service calls, and simplifies a sale.

Ownership and contracts

  • Proof of system ownership or title documents
  • Installer contract and final invoice
  • Any loan, lien, or PACE paperwork
  • Lease or PPA agreement with transfer terms, if applicable Why it matters: Confirms who owns the system, what must be paid or assigned, and who handles maintenance.

Permits, inspections, and interconnection

  • City of Glendale building/electrical permit numbers and final approval
  • Utility interconnection application and signed agreement with GWP
  • PTO letter or email from GWP Why it matters: Proves the system was permitted correctly and is authorized to export.

Technical and commissioning files

  • Single-line electrical diagram and commissioning checklist
  • Equipment datasheets and serial numbers (modules, inverters, optimizers, microinverters, batteries, racking)
  • Installer commissioning report and commissioning date Why it matters: Supports warranty registration and troubleshooting.

Monitoring and production history

  • Monitoring login or transfer instructions
  • At least 12 months of production data (screenshots and CSV exports)
  • Prior utility bills showing netting or export credits Why it matters: Helps validate performance and savings and identify issues early.

Warranty and maintenance records

  • Manufacturer warranties for modules, inverters, batteries, racking
  • Installer workmanship warranty and service agreements
  • Warranty registration emails or receipts
  • Service logs for cleanings, repairs, firmware updates, or replacements Why it matters: Keeps warranties in force and makes claims faster.

Additional helpful items

  • O&M manual and shading study or site assessment
  • Emergency shutdown steps and location of disconnects
  • Photos of the as-built system and component labels Why it matters: Speeds up service calls and supports buyer disclosures.

Monitoring apps: set up and transfer

Monitoring lets you keep a pulse on production and catch problems quickly.

What to collect from the seller or installer

  • Monitoring platform access for vendors such as Enphase, SolarEdge, Tesla, SMA, Fronius, or others
  • Gateway or monitoring device serial numbers
  • Instructions to transfer the owner account

Why monitoring matters

  • Real-time and lifetime totals confirm the system is producing as expected.
  • Device-level views can pinpoint a faulty panel, microinverter, or optimizer.
  • Alerts and error codes help you diagnose inverter or grid events.
  • If you have a battery, you can see state-of-charge and charge/discharge behavior.

Transfer credentials and alerts

  • Change the login email and password and update notification contacts.
  • Some platforms require the original account holder to start the transfer. Build that step into your closing checklist.

Data to request

  • Ask for at least the last 12 months of hourly or daily production data.
  • Request the installer’s expected production estimate to compare against actual results.

Warranties and service: how to be ready

A little prep saves time if you ever need a repair or claim.

Common warranty types

  • Module product warranty: often 10 to 12 years
  • Module performance warranty: often 25 years with a guaranteed output percentage
  • Inverter warranty: typically 5 to 12 years, sometimes extendable
  • Microinverter warranty: often 10 to 25 years
  • Battery warranty: usually a mix of years and energy throughput
  • Racking: commonly 10 to 25 years
  • Installer workmanship: often 1 to 10 years

Keep warranties transferable

  • Save serial numbers, commissioning reports, and proof of installation date.
  • Confirm if the manufacturer needs online registration or transfer steps.
  • Check the installer contract for any limits or fees to transfer workmanship coverage.

Filing a claim: what evidence helps

  • Serial numbers for inverters, modules, battery, and monitoring gateway
  • Commissioning date and installer report
  • Production logs showing a drop or failure
  • Photos or short videos of error codes or damage
  • Prior service tickets and installer contact info

Service workflow you can expect

  1. Check monitoring for errors and patterns.
  2. Contact the installer or service provider with serials and logs.
  3. Installer files manufacturer claim if it is a component defect.
  4. If the issue is utility-related, contact GWP and retain the ticket number.
  5. For leased or PPA systems, contact the servicer, who typically manages repairs.

Buyers: extra steps

  • Confirm that all warranties remain valid after ownership change.
  • For leased systems, complete assignment or payoff per the contract before closing.

Quick checklists

Documents to request from the seller

  • Proof of ownership or lease/PPA documents
  • City permits and final inspection approvals
  • GWP interconnection agreement and PTO
  • Monitoring access and at least 12 months of production data
  • All equipment and workmanship warranties

What to ask Glendale Water & Power

  • Is the interconnection agreement active on my account?
  • Which metering setup is on file and is a meter swap needed?
  • Which tariff applies to this service address and are TOU periods required?
  • Is PTO on record and are there any outstanding utility requirements?

What to bring to a service call or warranty claim

  • Serial numbers and commissioning report
  • Recent production screenshots and CSV exports
  • Permit finals and the single-line diagram
  • Installer and utility contact details and any prior ticket numbers

Red flags to investigate

  • Missing PTO or unsigned interconnection agreement
  • No production history or monitoring access
  • Installer out of business with no maintenance records
  • Active liens, unpaid loans, or unresolved permit corrections

Glossary

  • PTO: Permission to Operate, the utility’s formal authorization to export power.
  • Interconnection agreement: Your contract with the utility that details how your system connects to the grid.
  • Net metering vs net billing: Net metering nets kWh between imports and exports; net billing credits exports at a defined value.
  • TOU: Time-of-use billing, where rates vary by time period.
  • Inverter: Converts DC power from panels into AC power for your home.
  • Microinverter/optimizer: Panel-level devices that improve performance and enable detailed monitoring.

Buying or selling in Glendale with solar

If you are preparing to buy or sell a Glendale home with solar, plan ahead. Start by confirming system ownership, collecting the full binder, and checking that GWP has PTO and the right meter on file. Make sure monitoring access and warranty transfers are handled before closing. A clean, complete solar package builds buyer confidence and helps protect your long-term value.

If you want a hand organizing the right documents and aligning timelines with your sale or purchase, the Petro Real Estate Group is here to help. Schedule a Consultation to get a plan tailored to your home and your goals.

FAQs

How does Glendale Water & Power handle solar billing?

  • GWP uses its own municipal programs. You should confirm your account’s interconnection status, metering type, and tariff directly with the utility.

What is PTO and why do I need it in Glendale?

  • Permission to Operate is the written authorization from the utility that allows your system to export to the grid. You need PTO for compliant operation and billing.

Which documents should I request when buying a home with solar in Glendale?

  • Ask for ownership proof, permits and finals, GWP interconnection agreement and PTO, monitoring access with production history, and all warranty paperwork.

How do I transfer a solar monitoring account after closing?

  • Change the account email and password, update alert contacts, and follow the platform’s transfer process. Some vendors require the original owner to initiate.

What should I do first if my solar production drops?

  • Check your monitoring app for errors, gather recent production data, and contact your installer with serial numbers and logs. If it seems utility-related, contact GWP.

Work With Us

We pride ourselves in providing personalized solutions that bring our clients closer to their dream properties and enhance their long-term wealth. Contact us today to find out how we can be of assistance to you!